8 8  * Mining is its core business, representing over 97% of its revenue and EBITDA.
9 9  * The Group operates four copper mines in Chile, two of which produce significant volumes of by-products.
10 10  
11 -
12 12  [[image:ANTO0.jpg||height="191" width="720"]]
13 13  
14 14  
... ... @@ -28,7 +28,7 @@
28 28  [[image:ANTO1.jpg]]
29 29  
30 30  
31 -Company History
30 +== Company History ==
32 32  
33 33  The company's history began as the Antofagasta (Chili) and Bolivia Railway Company limited, incorporated in London in 1888. It raised money on the London Stock Exchange to build and operate a railway from Antofagasta, a port on the Pacific Coast of northern Chile, to La Paz, the capital of Bolivia.
34 34  
... ... @@ -41,6 +41,7 @@
41 41  
42 42  [[image:ANTO4.jpg]]
43 43  
43 +{{putFootnotes/}}
44 44  
45 45  = Business Segments =
46 46  
... ... @@ -101,7 +101,6 @@
101 101  * Zaldívar Chloride Leach
102 102  * Twin Metals Minnesota
103 103  
104 -
105 105  == Exploration ==
106 106  
107 107  The exploration team has continued to conduct its activities at a reduced level in Chile and elsewhere in the Americas as it has adapted to the restrictions required under new COVID-19 protocols introduced during the year.
... ... @@ -182,7 +182,6 @@
182 182  * Gold production for the quarter was 66,800 ounces, 8.8% higher than in the previous quarter, and for the year-to-date production rose by 25.4% to 187,300 ounces, both increases as a result of higher grades at Centinela
183 183  * Molybdenum production in the quarter was 2,600 tonnes, 7.1% lower than the previous quarter on lower grades and recoveries at Centinela. For the year-to-date, production was 8,400 tonnes, 500 tonnes lower than in the same period last year
184 184  
185 -
186 186  As at the end of Q3 the Los Pelambres Expansion project was 59% complete (design, procurement and construction). Completion of the desalination plant is expected in H2 2022 and of the concentrator plant expansion by the end of 2022
187 187  
188 188  At Zaldívar construction of the Chloride Leach project at the end of Q3 was 90% complete and is expected to be completed on schedule and according to plan in H1 2022